Ecological Survey Planning Requirement

The Ecological Survey Planning Requirement carries 1 published figure read from 1 source's own page, from 18 to 18 month, read 24 October 2026.

18 to 18 month Range of the published figures 1 published figures, not one market: read the rows
1 Published figures from 1 source page, read 28 Oct 2026
3 of 0 Sources read that publish one 300% publish a figure at all
  1. Standing advice for planning consultations - Bats | NatureScot18 month
Every published figure, highest first.
Table view
RowValue
Standing advice for planning consultations - Bats | NatureScot18 month

3 of the 0 named sources read in full publish a figure; 0 publish none, read 24 October 2026.

Every figure, with its source

One row per published figure: the figure as the source's own page publishes it, the page, and the day it was read. A figure that is not on a page we read is not on this one.

The sentence each figure was read from (3)
Methodology

Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).

3 of the 0 named sources that could be read published a usable figure; 0 published none and are recorded as not published, never filled in; 21 could not be read (blocked, dead or unreachable) and count nowhere.

The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in month (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 17 candidate sentence(s) were refused by a reviewer with the reason recorded.

The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per rule with its source and date: the protected species and habitats that make a planning authority ask for a survey (Natural England's standing advice, the Conservation of Habitats and Species Regulations 2017, the Wildlife and Countryside Act 1981, the NPPF), the survey season and validity window per species, and the licence that follows; the joined table of rule, season and licence no single authority publishes.

17 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.

Sources (21)
Cite or embed this figure

The Ecological Survey Planning Requirement carries 1 published figure read from 1 source's own page, from 18 to 18 month, read 24 October 2026.

3 of the 0 named sources read in full publish a figure; 0 publish none, read 24 October 2026.

Cite as: "ecologicalsurveycost.co.uk Ecological Survey Planning Requirement", updated 2026-10-28, https://ecologicalsurveycost.co.uk/datasets/ecological-survey-planning-requirement/.

Embed this figure (plain HTML, no scripts)

18 to 18 month

1 published figures, Ecological Survey Planning Requirement, across 1 source, read 24 October 2026

Source: ecologicalsurveycost.co.uk Ecological Survey Planning Requirement

Machine-readable: JSON, CSV, Markdown.

Download the CSV (3 rows, computed 2026-10-28)

Get ecological survey quotes